72.
Consider the following surveys
i) Reconnaissance survey
ii) Preliminary survey
iii) Traffic survey
iv) Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is

Read More Section(Railway Engineering)

Each Section contains maximum 100 MCQs question on Railway Engineering. To get more questions visit other sections.