The correct relation between curve lead (CL), switch lead (SL) and lead of crosssing (L) is given by
A. CL = L - SL
B. L = CL - SL
C. SL = L + CL
D. $${\text{L}} = \frac{{{\text{CL}} + {\text{SL}}}}{2}$$
Answer: Option B
Related Questions on Railway Engineering
In a shunting signal if the red band is inclined at 45° it indicates
A. Stop
B. Proceed
C. Proceed cautiously
D. None of the above
The standard length of rail for Broad Gauge and Meter Gauge are respectively
A. 12 m and 12 m
B. 12 m and 13 m
C. 13 m and 12 m
D. 13 m and 13 m
Join The Discussion