Lead of crossing is the distance from the
A. heel of the switch to the toe of the switch
B. heel of the switch to the theoretical nose of the crossing
C. toe of the switch to the theoretical nose of crossing
D. toe of the switch to the actual nose of crossing
Answer: Option B
Related Questions on Railway Engineering
In a shunting signal if the red band is inclined at 45° it indicates
A. Stop
B. Proceed
C. Proceed cautiously
D. None of the above
The standard length of rail for Broad Gauge and Meter Gauge are respectively
A. 12 m and 12 m
B. 12 m and 13 m
C. 13 m and 12 m
D. 13 m and 13 m
Join The Discussion