Consider the following surveys
i) Reconnaissance survey
ii) Preliminary survey
iii) Traffic survey
iv) Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is
A. i, iii, ii, iv
B. i, iii, iv, ii
C. iii, i, iv, ii
D. iii, i, ii, iv
Answer: Option D