Consider the following statements:
Automatic signalling system results in
1. greater risk
2. higher efficiency
3. avoidance of block instruments
4. higher operating cost
Of these statements
A. I and 2 are correct
B. 3 and 4 are correct
C. 1 and 4 are correct
D. 2 and 3 are correct
Answer: Option D
Related Questions on Railway Engineering
In a shunting signal if the red band is inclined at 45° it indicates
A. Stop
B. Proceed
C. Proceed cautiously
D. None of the above
The standard length of rail for Broad Gauge and Meter Gauge are respectively
A. 12 m and 12 m
B. 12 m and 13 m
C. 13 m and 12 m
D. 13 m and 13 m
Join The Discussion