A treadle bar is used for
A. interlocking points and signal
B. setting points and crossings
C. setting marshalling yard signals
D. track maintenance
Answer: Option A
Related Questions on Railway Engineering
In a shunting signal if the red band is inclined at 45° it indicates
A. Stop
B. Proceed
C. Proceed cautiously
D. None of the above
The standard length of rail for Broad Gauge and Meter Gauge are respectively
A. 12 m and 12 m
B. 12 m and 13 m
C. 13 m and 12 m
D. 13 m and 13 m
Join The Discussion